Annotated image of Lanzhou Enrichment Facility, August 2026

By Grant Christopher, Renny Babiarz1 and Hailey Wingo. This work benefited from collaboration with the Center for Nonproliferation Studies, Middlebury College.

A sixth centrifuge enrichment plant (CEP 6) is under construction at the Chinese uranium enrichment facility at Lanzhou. Enrichment capacity at Lanzhou has been expanding in recent decades, with a Russian-supplied plant constructed in 2001 and a first domestic centrifuge plant completed in 2010. Since 2010, two additional plants using domestic centrifuges were constructed. The new plant has a similar floorspace and external layout of the fourth and fifth enrichment plants at the site (CEP 4 & 5). 

The addition of CEP 6 has been confirmed via satellite imagery from AllSource Analysis and publicly available Chinese sources. The latter includes dimensions for the halls: two bays each 27 metres wide and 364 metres in length. These dimensions are consistent with the building seen on satellite imagery. 

Enrichment Capacity

Assuming the similarity of the external dimensions of CEP 5 and 6 extends to their internal floorspace as well, and that CEP 6 uses the same model of a second-generation Chinese centrifuge already deployed in CEP 5, then the enrichment capacity of CEP 6 probably resembles that of CEP 5. This was estimated by Hui Zhang to be 1.5-2 million SWU/year.2 

Purpose of the new plant

A Chinese language source indicates two possible functions of this plant, referencing both medium enrichment and depleted uranium re-enrichment projects. It is unclear which of these or either of these are the purpose for the plant. The production of medium enriched uranium could be of relevance to advanced reactor designs, potentially including the CFR-600s, if China is intending to fuel the second unit at Xiapu with domestic enriched uranium driver fuel until it switches over to MOX fuel.3 

Civilian, Military or Dual Use?

This new plant does not appear to be separately secured from the others and despite Lanzhou originally being part of the weapons programme, the existing enrichment plants at Lanzhou are under civilian regulatory oversight. Therefore, this plant is likely for civilian rather than military purposes. 

While the observed build-up of Chinese nuclear weapons is relevant, China is massively expanding its nuclear energy programme. It currently has over 63 GWe of nuclear power, up from 47 MWe in 2020.4 When factoring in nuclear power plants under construction, that number is expected to increase by around 25 GWe to 88 GWe by the end of the decade. The new reactors require enriched uranium, and to be able to meet fuel enrichment requirements, China needs to add approximately 200,000 SWU capacity for each GWe.5 Thus, China will need to add approximately 5 million SWU to meet projected civilian energy demands by 2030. 

  1. Renny Babiarz, PhD, is Vice President of Analysis and Operations for AllSource Analysis. ↩︎
  2. Hui Zhang, 2023. China started operation of two new enrichment plants in 2023. IPFM blog. Accessed at https://fissilematerials.org/blog/2023/12/china_started_operation_o_1.html  ↩︎
  3. There is evidence that China has established a facility at Baotou to produce enriched uranium fuel assemblies for the CFR-600; there could thus be a demand for domestic medium-enriched uranium for these. ↩︎
  4. Nuclear Reactors in China, World Nuclear Association. https://world-nuclear.org/nuclear-reactor-database/summary/China ↩︎
  5. World Nuclear Association, Nuclear Fuel Cycle Overview, https://world-nuclear.org/information-library/nuclear-fuel-cycle/introduction/nuclear-fuel-cycle-overview ↩︎

This is part of a two-year project funded by the Consortium to Reduce Nuclear Dangers. You can find out more about the project here.

This project is made possible by support from Andrew Carnegie Foundation (formerly Carnegie Corporation of New York) and Longview Philanthropy. The statements made and views expressed are solely the responsibility of the authors. 

[21 September 2026 – added reference for annual SWU requirement]