On 6th March, during remarks at a South Korean National Assembly Foreign Affairs and Unification Committee session, South Korean Unification Minister Chung Dong-young named a previously unconfirmed 3rd North Korean enrichment plant at ‘Kusong’. A later clarification was issued by the ministry that the ROK government cannot confirm Kusong as a nuclear facility and that the minister was referring to past open-source reporting. A statement released by the ROK to NK News was that the minister ‘misspoke’. 

The open-source report in question is a 2016 analysis by the Institute of Science and International Security. There the authors geolocate a potential underground uranium enrichment pilot plant, based on information from government sources linking the site with an underground aircraft spare parts manufacturing and assembly facility in the region. The government source provided also stated that it could house 200-300 centrifuges.  

The Kusong region is a strategic hub, near to key nuclear sites and containing the Panghyon Airbase, a major site for UAV development, and several other defence-related factories. 

Figure 1. Overview of the Kusong region. 

The high-explosives storage and testing site, Yongdoktong is 10 miles to the Northeast and Yongbyon is 30 miles to the East. 

The candidate enrichment site is a pilot plant that would have been built prior to Kangson, the first confirmed uranium enrichment plant, which was completed in 2003. This would date a Kusong plant to the late 1990s/early 2000s. The location of the site as proposed by the Institute of Science and International Security is in a mountain next to the outdoor area of the aircraft factory to the west with two identified underground facility entrances.  

Figure 2. Panghyon Aircraft Factory and Machine Plant, with the possible location for the candidate underground enrichment facility. 

The proposed location for Kusong was based on the connection to the aircraft factory and the underground facility entrances. It is possible that additional underground facilities are in the area of the factory along the valley to the southeast and the suspected Kusong enrichment plant is or was located there. It is also possible that the candidate site is located elsewhere in the region. 

In the 2016 report, it was noted that there was no information that the site continues to function as an enrichment plant.   

After the clarification of their remarks on Kusong, it is unclear if the ROK Unification Minister was relaying an ROK internal assessment or simply conveying publicly the openly available ISIS assessment. If Kusong was a pilot enrichment plant, it may no longer be associated with uranium enrichment. Nonetheless, VERTIC’s 2026 analysis notes that there is probably an additional enrichment plant containing 500-600 centrifuges that performs the final stage of enrichment up to weapons grade HEU. This could require a floorspace of less than 500 square metres assuming a density of 1.5-2 machines per square metre; a space which would easily fit within the possible underground area outlined in Figure 2. Such a facility has not been revealed and could be in an as-yet unidentified or unconfirmed site.